San Jose Water’s Cambrian Station long consisted of two large earthen embankment reservoirs with storage capacity of 12.1 million gallons and 3.9 million gallons, respectively. The first reservoir was originally constructed in 1890 and the second in 1921. Over time, both reached the end of their useful life.
Commencing in May 2024, this multi-year construction project will build two new tanks, providing 16 million gallons of potable water storage to our customers. The reservoir replacement project is scheduled to be completed in September 2027.
The project involves:
Why are the improvements necessary?
During construction, you may also notice some additional noise related to the use of equipment necessary to demolish the existing reservoirs, move large quantities of earth, and construct two large concrete water storage tanks. After some initial earthwork, sound attenuating measures along the property boundary are planned as part of the project to ensure construction noise is consistent with the City’s policies. Work will be done Monday through Friday between the hours of 7:00 AM and 7:00 PM, in accordance with City of San Jose ordinances.
Did you know?
The first pressurized zone in the City of San Jose became known as the Cambrian Zone — growing from approximately 9,000 residents in 1870 to over 225,000 residents. Today, Cambrian Zone encompasses much of the City’s downtown region. The new tanks at Cambrian Station will continue to serve this same area for generations to come.
Check this page for updates as we work our way through the stages of this crucial infrastructure improvement project.